This video walks through the very basic steps for installing tarpaper felt.
Installing breathable roofing felt.
This will create a secondary water resistant barrier.
Setting the roll and then nailing off.
Fasten drip edge on eaves with.
Never install the felt vertically across your roof.
Roofing felt is comprised of a base made from natural materials such as wood cellulose or synthetic ones such as fiberglass or polyester and then coated or saturated with a protective coating such as bitumen asphalt which repels water but still allows the product to breathe.
At abutments turn the underlay up by at least 100mm.
Taking the time to properly prepare the sheathing will make all the difference in how quickly and easily the felt paper is installed.
Hang the lower edge of the felt over the eave the part of the roof that meets or overhangs the shed s walls by about 0 5 to 0 75 inches 1 3 to 1 9 cm.
Installing the roofing felt does take care but can go very quickly.
Nail metal drip edge flashing which bends over the roof and down the edge of the facing board on all roof edges.
If you have any queries or project specific questions feel free to call our team on 01752 692760 or use the live chat in the bottom right hand.
These thick layers of roofing felt are installed by heating the back of the felt with a butane torch and then carefully applying it to the roof.
Installing roof felt is a two person job.
Residential and commercial roofing shingles slate roof ventilation roof underlayments asphaltic and tpo roof membranes.
Here at roofing superstore we have a number of breathable roof membranes available for your latest roofing project from tyvek supro breather membrane to cromar s breathable membrane tlx breathable pitched roofing felt klober permo and more.
Roofing shingles and materials plus factory certified roofers including ratings from real homeowners from north america s largest roofing manufacturer.
If you get to the end of a roll and need to begin a new roll make sure the edge of your new roll overlaps the edge of the old roll around 4 inches.
As you install your first layer of roofing felt make sure it hangs over your eave by about 6 inches.