Purlins are pre punched z shaped with a yield strength of 55 000psi and fabricated in 12 14 and 16 gauge depending on the building loads.
Installation sag strap in roof frame iron.
Each clamp bonds with the module frame and the rail to form a parallel grounding paths that is repeated throughout the array.
Additional installation information can also be found in the simpson strong tie wood construction connectors catalog.
Complete the first row.
Lay the roofing felt.
Frame with the enphase frame mount.
If you re unable to find what you re looking for please contact us right away and we d be more than happy to help.
The roof panels are fastened to these members and provide the strength and framework of the roof.
Xr rails are the backbone of the solar array.
Flat roof documents resources.
2 corrugated metal roof installation instructions.
In some regions stick frame roofs may be preferred when flexibility in the roof shape is a desirable design feature.
When installing the enphase microinverters per the specifications in the mlpe installation section of this manual the total roof mounted pv system is bonded modules racking and microinverters and grounded through the enphase ground circuit when the enphase units are properly grounded through to the service.
Lay and secure the first metal panel.
Install the roofing screws vertically along each rib in the panel.
Be sure the larger edge is laid so that the small edge of the next panel will overlap it.
Tin roofing also known as metal roofing is considered more durable than composition or wood shingles.
The roofing is manufactured in panels that.
Select the model from a dropdown list by product category below.
Installing wood stripping under a tin roof.
Find the documents you need for your flat mount installation below in addition to some frequently asked questions.
These steel members span the length of the building between frame lines on the roof.
Their unique curved profile increases structural strength and spanning capability allowing for fewer roof penetrations and more cost effective system designs.
Buy the metal panels.
General before the mueller prefabricated steel building arrives the site and foundation should be prepared.
This flexibility can help create open space inside the home or a more spacious attic.
Finish the first side of the roof.