Allow for a minimum of 18.
Install tin roof shed.
Step 1 select a tin roof type.
Most metal shingles will be attached to the roof using metal shingle.
Work up from the initial row starting at the lower corner in a diagonal pattern staggering the shingles to prevent gaps.
Decide what type of tin roof you want by selecting either an r panel or v crimp style.
Without getting up on the roof itself you can get the measurements simply by measuring the.
It s not the hard it is just nice having some company while working.
Add the metal panels.
Step 5 install slat.
Some panels have pre drilled holes.
Corrugated metal roof installation instructions step 1.
You can either buy.
Then attach the metal roof material with screws make for roofing.
I ll show you some tips tricks a.
Then trim all edges of the roof with metal trim made for that purpose.
Take care the first piece is aligned precisely perpendicular square to the edge.
Cut the panels to the desired length.
Determine which kind of metal you will use to repair the roof.
If yours do not then you will need to drill holes.
Pre drill holes on the ridges.
Measure the length and width of your roof measuring both sides if your outbuilding s roof has a peak.
Depending on the area of the roof you can use different sized panels.
Step 3 buy the materials.
How to install a metal roof on a shed step 1.
Allow for at least 1 foot extra all the way around.
How to install a tin roof on an outbuilding 1.
Step 2 take measurements.
C mon over i need a little help installing this roof.
Measure the roof to determine how much metal you will need.
The r panel type metal roof is curvy and requires.
Most panels come up to 32 feet 9 8 m in length.
Installing corrugated roofing 1.
How to install a tin roof.
For an r panel style.
You might have to stagger the metal and cut one or both outside edges to get the correct overall width.
Build the roof as normal with the trim felt paper and metal flashing.
Take your first sheet of metal and place it on the roof so that it overhangs the edge at least 3 4 in 1 9 cm.
Always begin working at the point with the longest peak to eave distance.
Buy the metal panels.
Step 4 remove the current roof and line it.