Insert the wide flank of drip cap underneath the first course of shingle or tile all the.
Install metal roof drip edge.
How to install a drip edge.
The roof leg should extend a minimum of 2 back onto the roof sheathing.
Secure the drip edge with roofing cement.
Please like and subscribe for more instructional videos.
Overlap two pieces of flashing that meet end to end by at least 1 inch.
Make sure the corner is tight and that the bottom edge is tight to the fascia before nailing off the drip edge.
Slip the upper end of the uppermost piece under the portion of the metal at the peak of the roof.
Step by step install drip edge on a metal roof build the lower rim of roof extended away from the fascia.
Most metal shingles will be attached to the roof using metal shingle.
Lay the starter row of metal shingles at the drip edge and affix to the roof with metal roofing nails.
Install sheet metal drip cap over the lower rim.
You may need to nail through the starter strip into the drip edge.
Space the fasteners by about 12 inches.
Slip the wide flat flange of the material all the way under the first course of roof shingles as illustrated.
To install a drip edge on a newly constructed roof or on a re roofing job attach the drip edge along the roof s eaves first.
Install the drip edge by fitting it on the roof eave pushing it tightly against the edge of the plywood and nailing or screwing it down.
How to install drip edge flashing to a new roof.
Make sure the outer edge extends over the gutter.
Place a nail at one end then the other.
The extension should be at least inch for it to work.
Work up from the initial row starting at the lower corner in a diagonal pattern staggering the shingles to prevent gaps.
Apply a continuous bead of cement along the top of the drip edge then press down on the shingle.
Install the edge metal at the opposite edge of the roof starting at the bottom as before.
If it doesn t pull the drip edge out slightly from under the shingles.