Start applying the adhesive in a bottom corner about 1 tile length away from the bottom and side of the wall leaving space for the edge tiles.
How to level walls for tile.
Apply a 1 8 inch 0 32 cm layer of adhesive to the wall.
Use tile spacers if necessary to keep the tile lines straight in the layout.
Spread thinset mortar on the bottom center of the wall.
Scrape away any loose or peeling paint or wallpaper.
How to get flat walls for your tile.
I also talk about the difference between a traditional shower system with a referred to as a water in water out system.
Start by removing any molding switch plates outlet covers and other hardware attached to the area being tiled.
Remove the ledger later and trim tiles to fill the gap below.
Do this prior to any tiling job.
With a 3 16 v notched trowel spread mastic just under the laser line and down the side of the tub wall to a small area.
It is one of original tile leveling systems and the best kit overall.
Remove any remaining dust oil or grease with tsp tri sodium phosphate or an ammonia based cleanser.
Thus they need to be installed in a square space.
Fasten a straight ledger to the wall to support the tiles.
Holding a bubble level to a straight six or eight foot board make sure that both walls and the floor are plumb vertical and level.
Slide a 4 foot straightedge or level over the wall in all directions to check for plumb.
Check the wall first to see if it is straight.
The obvious way to tile a wall is to start at the bottom and work your way up.
Use a 360 degree laser level to mark a line for laying the tiles.
And that works fine if the base of the wall usually the floor or bathtub is perfectly flat and level.
Let the wall dry thoroughly.
This system comes with pliers clips and levelling wedges all that helps to level your tiles.