All nails must be covered with a membrane.
How to install waterproof membrane on roof.
O c plan is available in different thicknesses with central glass fleece reinforcement with or without polyester fleece backing with one sided or.
This is thermoplastic can be welded and reshaped by thermal heat.
Physically repairing or remodelling the roof is an expensive task which is why a good solution is to apply waterproof membranes and improve the overall water drainage of the roof.
The first step in waterproofing a roof is cleaning of the.
Cleaning priming treatment of details main coating application and inspection.
Clear roof surface of debris.
A typical application of liquid applied roof membranes consists five main steps which should all be treated with utmost importance following the product manufacturer instructions.
When building a new building where below grade structures may be at risk for water intrusions such as basements elevator pits or underground garages waterproofing is essential to keep these areas dry.
6 products 1 2 o c plan roofing and sealing membrane ecb o c plan is a synthetic roof and waterproofing membrane made from the material ecb ethylene copolymer bitumen.
Install the membrane horizontally starting at the bottom of the slope.
You should only use an 80 mil membrane because thinner membranes have a high risk of tearing.
Seal edges and all roof penetrations.
Here is an article describing the installation of sheet applied waterproof membrane.
Membrane roofing installation labor basic basic labor to install membrane roofing system with favorable site conditions.
Unroll and position the roll.
When the slope is rather steep 3 12 25 and above it is best to mechanically fasten the membrane by adding roofing nails to the horizontal overlaps every 12 in 30 cm before covering them with the next membrane strip note.
Cut and layout material apply recommended adhesive and roll.
To ensure that your roof deck is completely watertight and will last a long time we recommend the following tpo membrane installation guidelines.
Next lay the breather membrane parallel with the roof eaves normally when installing breather membrane the printed side should face outwards.