Install new flashing metal flashing is often called drip edge along the.
How to install torch on roofing felt.
Installing the torch down roofing involves flames and melted asphalt.
Overlap each row at least 3 to 4 inches.
Start by laying asphalt felt or other underlayment over the roof.
This will help you get started and you will also learn some tricks.
If you live in an area with inclement weather you should consider using a special ice and water protector.
Nail metal drip edge flashing which bends over the roof and down the edge of the facing board on all roof edges.
Installing the roofing felt does take care but can go very quickly.
Hang the lower edge of the felt over the eave the part of the roof that meets or overhangs the shed s walls by about 0 5 to 0 75 inches 1 3 to 1 9 cm.
You will need to use your gloves and boots on occasion to roll or press down on the bitumen sheets as they bubble.
Using your staple gun secure the felt to the roof.
Fasten drip edge on eaves with.
These thick layers of roofing felt are installed by heating the back of the felt with a butane torch and then carefully applying it to the roof.
Installing roof felt is a two person job.
Also cover up with long sleeved clothing to reduce the chances of an accident.
The term cold applied is referring to o.
Choose heat resistant gloves and boots made of a material like kevlar.
Cold process modified bitumen roll roofing is another way to apply rolled roofing other than hot mopping or torching.
Never install the felt vertically across your roof.