To seal a plumbing vent spread roofing.
How to install roll roofing shingles.
Use the chalk line to snap a straight line vertically every 6 inches.
Every 5 inches make a new mark until you get to the rop of the roof.
Use a trowel to scoop up the roofing cement.
Mark a chalk line to identify the end of your first layer.
To install roll roofing you ll need to cut the material into long strips of the correct length for your roof and lay it flat.
Install roll roofing when the temperature is at least 50 degrees fahrenheit to keep the material from cracking.
Nail it in place with roofing nails that penetrate at least 3 4 inch into.
Position the first course so it overhangs the drip edges by about 1 4 inch and roll it out a.
Install peel and stick roofing in a similar manner.
It also helps if you first install a layer of roofing felt.
Snap a chalk line as a guide for the first layer roofing.
Apply roofing cement to the roof.
Using a measuring tape measure 35 inches 89 cm up from.
Use your chalk and tape measure to mark about 12 inches up on the roof for the first set of shingles.
Cut the rolled roofing.
Spread the roofing cement along the.
Drip edge or drip cap is either plastic or sheet metal.
It not only protects the roof but it also protects the fascia.
How to do it attach first course.
Plan so that no two butt joints are closer than 2 feet from each other.
Do not use the eaves as a guide instead because they can be uneven.
Installing the rolled roofing 1.
For extra durability you may install roll roofing in two layers.
Install roll roofing measure 35 inches up from the eaves at several intervals along the roof and mark them.