Align each stud with the 16 inch on center marks made earlier.
How to fur out a concrete wall.
Now repeat this process at the top of the wall.
With a pencil or a.
With a pencil or a marker draw vertically lines from.
Use chalk to draw the lines and a straight edge as a guide.
Assemble the wall frame on the floor by placing the studs between the top and bottom plates.
Equip yourself with a tape measure and spread it cross the bottom of the wall your about to furr out.
Personally i use tapcon brand screws to hold the strips.
I recommend a decent corded hammer drill if this is a.
These markings will indicate where you will vertically attach your.
Using a hammer drill drill holes using the correct diameter carbide tipped masonry bit for the concrete screw diameter in use.
Drive the screws into the holes with a standard drill and continue until all studs are firmly in place.
Cut 2 by 4 blocks to fit between.
Using the level plumb down the wall and draw a line for reference.
Mark the wall for vertical furring strips installed 16 inch on center.
Make exact measurements ensure secure wall covering.
Determine spacing and location of furring strips.
Pre drill the holes in the furring strips so they do not crack when.
Assemble the wall frame.
Clear the holes of all debris.
Measure the wall stud height in three or four spots and cut the studs to the shortest dimension using a portable circular saw.
Tapcon concrete screw installation.
Mark the cinder block wall every 16 inches vertically and then every 16 inches horizontally to form a grid pattern.
Cut away the ceiling sheathing or drywall if present to reveal the ceiling from the concrete wall back to the next joist.